top of page


CONTRACT
VALUE
£3,000,000
THE
CLIENT
Newark &
Sherwood Council
CONSTRUCTION
PERIOD
10 Months
THE
CONTRACTOR
Ascot Services
Project Gallery
the Dukeries Leisure Centre

We are immensely proud and excited to open the doors to our new pool. This is another milestone project for the district council that will do a great deal for the health and wellbeing of the residents of Ollerton and the surrounding communities.
Rodger Jackson - Chairman
Scheme Journey
Creating Lichfield Leisure Centre
01
The
Vision
Keeping Swimming in
The Community
The Dukeries Leisure Centre was facing a critical challenge. Its ageing pool provision dated back to the 1950s, operating costs were rising and the loss of usable water space was putting the future of local swimming at risk.
The ambition was to protect community access to swimming with a modern, accessible facility that could also support shared use with the neighbouring academy and connect effectively with the existing leisure centre.
A £12m Rebuild
Wasn’t the Answer
With the cost of a traditional replacement estimated at around £12 million, simply rebuilding what was already there was becoming increasingly difficult to justify.
ReCreation helped create a different route forward. Instead of accepting that modern swimming provision had to come with a conventional price tag, the project embraced prefabricated pool technology and a more efficient approach to development.
02
Challenging Convention
03
ReCreation Collective
Specialist Thinking.
One Shared Goal.
ReCreation’s approach brought together the expertise needed to rethink what was possible within the available investment.
Aquatic, design, engineering, commercial and project expertise could be considered together, creating a solution focused not only on delivering new water space, but on accessibility, connectivity, operational efficiency and the long term needs of the community.
A Smarter Way to Add Water
A new 20m x 10m five lane pool was created adjoining the existing leisure centre, incorporating a unisex changing village, spectator area, pool plant, reception, storage and accessible facilities.
Prefabricated pool tank technology, a structural steel frame and a reinforced concrete mezzanine helped reduce programme and cost while creating a facility that integrated with the existing dry side leisure provision.
04
Delivery
in Action
05
Beyond
Construction
Protecting Access.
Creating Opportunity.
Dukeries replaced lost swimming capacity and created opportunities for new community activities, while achieving the development with a more modest capital investment and without increasing staffing overheads.
The new facility also supports shared use with the academy, helping swimming remain accessible to both the wider community and the next generation.
MORE ACCESS. MORE OPPORTUNITY.
A FUTURE FOR LOCAL SWIMMING.
Facts, Features & Benefits
25 METRE 5 LANE
SWIMMING POOL
SWIMMING POOL POD ACCESSIBLE LIFT

A SHORTER
CONSTRUCTION TIME
UV LIGHT
FILTRATION
SPECTATOR VIEWING AREA & CHANGING VILLAGE
OLYMPIC LED DEVELOPMENT PARTNER & FULLY INTEGRATED PROJECT TEAM
SIGNIFICANT CAPITAL SAVING ON
NEW FACILITY FOR THE CLIENT
HEALTHIER AND IMPROVED
COMMUNITY WELLBEING